Wind · Athena Energy Australia (Holdings) Pty Ltd · Wind Turbine - Onshore
Stats window 03 Jun 2026 16:20 → 04 Jun 2026 16:20 AEST
03 Jun 2026 16:20 → 04 Jun 2026 16:20 AEST
| Capex total (greenfield) |
$750.00M
How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,373,418
How this was derived Reference |
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
$9.16M
How this was derived Reference |
| Fixed OPEX / MW-yr |
$29,000
How this was derived Reference |
| Variable OPEX / MWh |
$0.00
How this was derived Reference |
| Fuel cost / GJ |
$0.00
How this was derived Reference |
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026
Notes
Bendemeer Wind Farm is not operational and has no DUID found in searched public sources. Latest NSW Planning Portal / SEARs-stage material identifies a proposed wind farm of up to 51 turbines and up to 316 MW, while the owner website describes 360 MW and older/project-benefits material and NEMStats list 380 MW. Financial profile uses the most specific wind-only capex found: A$750 million reported in November 2024 for the proposed 316 MW Bendemeer Wind Farm, giving A$2.373m/MW on the 316 MW planning scope. Fixed O&M, variable O&M, asset life and discount rate are not generator-specific; they are technology defaults from CSIRO/AEMO GenCost 2025-26 consultation draft for wind onshore. Fixed annual O&M is calculated as 316 MW x A$29,000/MW-year. Heat rate and thermal efficiency are not applicable to wind generation. The project is at Prepare EIS / prospective stage; no refurbishment history exists. Decommissioning is expected at end of operating life, supported by a Decommissioning Fund Deed and Decommissioning Guarantee per owner material.