Solar · Iberdrola Australia Limited · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.8446 |
| 2025-07-01 | 0.8698 |
| Capex total (greenfield) |
$325.52M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,281,074
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$8.14M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$32,031
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026
Notes
Plant-specific greenfield construction cost was found in a project economic impact assessment provided to NSW planning: approximately A$250 million for the Avonlie Solar Farm project, attributed to RES. Iberdrola's 2021 announcement confirms final investment decision and states Avonlie is part of nearly A$1 billion of capital commitments across Avonlie, Port Augusta Renewable Energy Park, and Wallgrove Grid Battery; however, that figure is portfolio-level, not Avonlie-specific. O&M was not found as plant-specific data, so a benchmark-style estimate from AEMO/CSIRO large-scale solar PV assumptions was used as a fallback. The project is single-axis tracking; fixed OPEX per MW-year was inferred from the AEMO solar PV report's 40MW hypothetical project annual O&M cost ($624,000) divided by 40MW.