Mt Stuart

QLD · Others · MSTUART2
As of 4 Nov 20:25 NEM time (AEST) · SCADA current
Latest output
0.0 MW
Declared availability (next-day)
0.0 MW
Regional price
$108.83/MWh

Aligned 5-minute series in NEM time (AEST). Coverage 95% of expected intervals.

Material events

No recent material events.

Peer comparison

Same technology (Others) and region (QLD). One row per site — DUIDs at the same site are combined and energy-weighted. Period 3 Nov 20:29 – 4 Nov 20:29 NEM time. Coverage 95%. Interval energy (max(0, SCADA MW) × 5/60 h) times the regional reference price, divided by that energy. A spot-market metric, not realised revenue.

Asset Energy MWhGeneration-weighted spot
Mt Stuart (this asset) 0.0 —
Rocky Point Sugar Mill Cogeneration Plant 191.9 $40.71/MWh

Detection defaults for Others

Availability drop 20.0 MW or 15%; output drop 20.0 MW or 20%; high price from $300.00/MWh while output is below 25% of last-known availability; minimum 10 minutes; cooldown 60 minutes.

AEMO settlement timestamps are period-ending Australian Eastern Standard Time year-round. They do not observe daylight saving. A 14:05 stamp covers 14:00:01–14:05:00 AEST.

Energy and FCAS bid/rebid files (BIDDAYOFFER / BIDPEROFFER) are not ingested. AEMO publishes “Yesterday’s Bids” the next day; this release does not show bid bands, rebids or published reasons.

Binding constraint identities from dispatch are not ingested, so constraint overlays are not shown. State of charge is only stored from Next_Day_Dispatch INITIAL_ENERGY_STORAGE. It is next-day, not live, and is omitted when the field is absent.