Yambuk (YAMBUKWF)

Wind · Energy Pacific Vic Pty Ltd · Wind Turbine - Onshore

Operational AEMO: In Service VIC1 Wind - Wind NEM data · 6h
30 MW
Registered nameplate capacity
6h revenue
$441
Capacity factor
4.0%
Revenue / MWh
$61.22
Est. SRMC
$0.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
30 MW

AEMO status In Service
Project status Operational (AI)

The Wind Power 2026 lists Yambuk Wind Farm as operational; Pacific Blue’s operating site page confirms it as an operating asset.

Region VIC1
Coordinates -38.31260, 142.02220 (AI)

Global Energy Observatory lists Yambuk Wind Farm at latitude -38.3126, longitude 142.0222.

MLF 1.0018
DUID YAMBUKWF
Owner Energy Pacific Vic Pty Ltd
Commissioned
Expected closure 2031
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM Neg Micon
Turbine model NM 1500/70
Equipment confidence high
Stats window
14 Jun 2026 00:00 → 14 Jun 2026 06:00 AEST

Dispatch & revenue

14 Jun 2026 00:00 → 14 Jun 2026 06:00 AEST

Energy revenue (× MLF)
$441
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
7.2 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
1.0018
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9993
2025-07-01 1.0018

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
30 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.50/MWh
Capex total (greenfield) default
$66.00M

Shown in table
$66.00M (2026 real AUD)

Capex refurbishment
Capex / MW default
$2,200,000

Shown in table
$2.20M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh default
$0.50

Shown in table
$0.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown