Wyalong Solar Farm (WYASF1)

Solar · Wyalong Solar Farm Pty Ltd as the trustee for the Wyalong Solar Farm Unit Trust · Solar PV - Single axis tracking

Operational AEMO: In Service NSW1 Solar - Solar NEM data · 24 hours
62 MW
Registered nameplate capacity
24 hours revenue
$663
Capacity factor
1.6%
Revenue / MWh
$27.39
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
62 MW

AEMO status In Service
Project status Operational (AI)

pv magazine Australia 2023; commissioned and generating from Sept 2023.

Region NSW1
Coordinates -33.93000, 147.18000 (AI)

OX2 project page; located 7.5km north-east of West Wyalong, NSW.

MLF 0.9220
DUID WYASF1
Owner Wyalong Solar Farm Pty Ltd as the trustee for the Wyalong Solar Farm Unit Trust
Commissioned Jun 2023
Expected closure 2053
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM Risen Energy
Module / inverter supplier module / inverter supplier
Inverter OEM Sungrow
Inverter model SG10RT 3PH
Equipment confidence medium
Stats window
12 Jun 2026 20:15 → 13 Jun 2026 20:15 AEST

Dispatch & revenue

12 Jun 2026 20:15 → 13 Jun 2026 20:15 AEST

Energy revenue (× MLF)
$663
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
24.2 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9220
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.8752
2025-07-01 0.9220

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
62 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield) default
$81.02M

Shown in table
$81.02M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,300,000

Shown in table
$1.30M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh