White Rock Wind Farm - Stage 1 (WRWF1)

Wind · CECEP Wind Power Australia Pty Ltd · Wind Turbine - Onshore

Operational AEMO: In Service NSW1 Wind - Wind NEM data · 30 days
175 MW
Registered nameplate capacity
30 days revenue
$3.35M
Capacity factor
43.6%
Revenue / MWh
$61.03
Est. SRMC
$0.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
175 MW

AEMO status In Service
Project status Operational (AI)

AEMO registration status shows White Rock Wind Farm - Stage 1 is In Service; project is publicly known as completed and generating.

Region NSW1
Coordinates

MLF 0.8149
DUID WRWF1
Owner CECEP Wind Power Australia Pty Ltd
Commissioned
Expected closure 2038
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM Vestas
Turbine model V136-3.45
Equipment confidence low
Stats window
15 May 2026 01:10 → 14 Jun 2026 01:10 AEST

Dispatch & revenue

15 May 2026 01:10 → 14 Jun 2026 01:10 AEST

Energy revenue (× MLF)
$3.35M
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
54,899.4 MWh
Available
54,675.4 MWh
Curtailed
26.5 MWh
Curtailment
0.0%
of available
MLF used
0.8149
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.8453
2025-07-01 0.8149

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
175 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.50/MWh
Capex total (greenfield) default
$385.00M

Shown in table
$385.00M (2026 real AUD)

Capex refurbishment
Capex / MW default
$2,200,000

Shown in table
$2.20M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh default
$0.50

Shown in table
$0.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown