Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
13 Jun 2026 09:05 → 14 Jun 2026 09:05 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 1.0026 |
| 2025-07-01 | 1.0038 |
| Capex total (greenfield) default |
$136.00M
Shown in table |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW default |
$4,000,000
Shown in table |
| Fixed OPEX (annual) |
$1.00M
Shown in table |
| Fixed OPEX / MW-yr |
$29,412
Shown in table |
| Variable OPEX / MWh |
$10.00
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 02 Jun 2026
Notes
Capex data is not specifically available for West Kiewa; estimates based on average costs for hydro projects.