Wellington Solar Farm (WELLSF1)

Solar · Lightsource Australia SPV 4 Pty Ltd · Solar PV - Single axis tracking

Operational AEMO: In Service NSW1 Solar - Solar NEM data · 24 hours
216 MW
Registered nameplate capacity
24 hours revenue
$11.0k
Capacity factor
5.0%
Revenue / MWh
$42.62
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
216 MW

AEMO status In Service
Project status Operational (AI)

AEMO registration shows the site in service and the project was commissioned on 2022-12-01; no contrary evidence found indicating it is still in construction or commissioning.

Region NSW1
Coordinates

MLF 0.9230
DUID WELLSF1
Owner Lightsource Australia SPV 4 Pty Ltd
Commissioned Dec 2022
Expected closure 2051
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM JA Solar
Module / inverter supplier Module / inverter supplier
Inverter OEM Sungrow
Inverter model SG250HX
Equipment confidence low
Stats window
12 Jun 2026 14:05 → 13 Jun 2026 14:05 AEST

Dispatch & revenue

12 Jun 2026 14:05 → 13 Jun 2026 14:05 AEST

Energy revenue (× MLF)
$11.0k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
257.2 MWh
Available
170.9 MWh
Curtailed
MWh
Curtailment
0.0%
of available
MLF used
0.9230
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9284
2025-07-01 0.9230

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
216 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield) default
$280.90M

Shown in table
$280.90M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,300,000

Shown in table
$1.30M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown