Walla Walla Solar Farm (WLWLSF2)

Solar · FRV Australia (Walla Walla Asset Co Pty Ltd (ACN 634 728 868) as trustee for the Walla Walla Asset Trust) · Solar PV - Single axis tracking

Commissioning AEMO: In Commissioning NSW1 Solar - Solar NEM data · 7 days
152 MW
Registered nameplate capacity
7 days revenue
$138.1k
Capacity factor
9.3%
Revenue / MWh
$57.97
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
152 MW

AEMO status In Commissioning
Project status Commissioning (AI)

User-provided AEMO registration status: 'In Commissioning'; commissioned date 2025-03-01, indicating commissioning phase rather than full operations.

Region NSW1
Coordinates

MLF 0.9298
DUID WLWLSF2
Owner FRV Australia (Walla Walla Asset Co Pty Ltd (ACN 634 728 868) as trustee for the Walla Walla Asset Trust)
Commissioned Mar 2025
Expected closure 2054
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
07 Jun 2026 08:15 → 14 Jun 2026 08:15 AEST

Dispatch & revenue

07 Jun 2026 08:15 → 14 Jun 2026 08:15 AEST

Energy revenue (× MLF)
$138.1k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
2,382.2 MWh
Available
2,751.1 MWh
Curtailed
369.3 MWh
Curtailment
13.4%
of available
MLF used
0.9298
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-09-10 0.8853
2025-07-01 0.9298

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
152 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield) default
$197.56M

Shown in table
$197.56M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,300,000

Shown in table
$1.30M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown