Walla Walla Solar Farm (WLWLSF1)

Solar · FRV Australia (Walla Walla Asset Co Pty Ltd (ACN 634 728 868) as trustee for the Walla Walla Asset Trust) · Solar PV - Single axis tracking

Operational AEMO: In Commissioning NSW1 Solar - Solar NEM data · 21h
152 MW
Registered nameplate capacity
21h revenue
$5.4k
Capacity factor
6.0%
Revenue / MWh
$28.32
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
152 MW

AEMO status In Commissioning
Project status Operational (AI)

FRV Australia 2024 project page and FRV press release reporting Walla Walla Solar Farm in operation / fully operational.

Region NSW1
Coordinates

Location identified only at site level from FRV project page / search results; no precise coordinates provided in the supplied sources.

MLF 0.8908
DUID WLWLSF1
Owner FRV Australia (Walla Walla Asset Co Pty Ltd (ACN 634 728 868) as trustee for the Walla Walla Asset Trust)
Commissioned Mar 2025
Expected closure 2054
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM Trina Solar
Module / inverter supplier PV module supplier
Inverter OEM Huawei
Inverter model SUN2000 string inverter platform
Equipment confidence low
Stats window
02 Aug 2026 00:00 → 02 Aug 2026 20:35 AEST

Dispatch & revenue

02 Aug 2026 00:00 → 02 Aug 2026 20:35 AEST

Energy revenue (× MLF)
$5.4k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
192.2 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.8908
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of chargeINITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-09-10 0.8853
2025-07-01 0.9298
2026-07-01 0.8908

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
152 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield) default
$197.56M

Shown in table
$197.56M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,300,000

Shown in table
$1.30M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown