BESS · Ulinda Park ProjectCo Pty Ltd · Storage - Battery
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
22 Jul 2026 00:00 → 22 Jul 2026 21:00 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
Stored energy at the start of each 5‑minute interval (AEMO INITIAL_ENERGY_STORAGE).
Available up to the latest next‑day dispatch file.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.INITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.| Effective from | MLF |
|---|---|
| 2025-06-03 | 0.9698 |
| 2025-07-01 | 0.9851 |
| 2026-07-01 | 0.9778 |
| Capex total (greenfield) |
$110.02M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
No plant-specific greenfield capex announcement or owner-reported total project cost was found in the searched sources. The project is operational at 155 MW / 298 MWh and is operated by Akaysha Energy, while the registered owner is Ulinda Park ProjectCo Pty Ltd. GenCost 2024-25 confirms large-scale battery costs fell 20% year-on-year, but the report excerpt accessible here did not expose a usable plant-specific capex benchmark, so capex fields remain unset rather than inferred from benchmark assumptions.