Tallawarra B (TALWB1)

Gas Peakers · EnergyAustralia Tallawarra Pty Ltd · Turbine - OCGT

Operational AEMO: In Service NSW1 Fossil - Natural Gas Pipeline NEM data · 24 hours
320 MW
Registered nameplate capacity
24 hours revenue
$0
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$128.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
320 MW

AEMO status In Service
Project status Operational (AI)

EnergyAustralia/State planning materials indicate Tallawarra B was commissioned on 2024-06-01 and is in commercial service.

Region NSW1
Coordinates -34.48060, 150.81970 (AI)

Tallawarra Power Station site in Yallah, NSW (public mapping/planning references for Tallawarra B).

MLF 0.9924
DUID TALWB1
Owner EnergyAustralia Tallawarra Pty Ltd
Commissioned Jun 2024
Expected closure 2053
Closure date
Technology Turbine - OCGT
Fuel Fossil - Natural Gas Pipeline
Gas turbine OEM GE Vernova
Turbine / engine model LM6000
Equipment confidence medium
Stats window
12 Jun 2026 23:45 → 13 Jun 2026 23:45 AEST

Dispatch & revenue

12 Jun 2026 23:45 → 13 Jun 2026 23:45 AEST

Energy revenue (× MLF)
$0
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
MWh
Available
1,365.0 MWh
Curtailed
1,365.0 MWh
Curtailment
100.0%
of available
MLF used
0.9924
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9843
2025-07-01 0.9924

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
OCGT
Capacity
320 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$128.50/MWh
Capex total (greenfield) default
$384.00M

Shown in table
$384.00M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,200,000

Shown in table
$1.20M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$45,000

Shown in table
$45.0k (2026 real AUD)

Variable OPEX / MWh default
$2.50

Shown in table
$2.50 (2026 real AUD)

Fuel cost / GJ default
$12.00

Shown in table
$12.00 (2026 real AUD)

Heat rate GJ/MWh default
10.50

Shown in table
$10.50 (2026 real AUD)

Confidence: unknown · Status: needs review · Capex basis: unknown