Coal · EDL TT Pty Ltd · Reciprocating Engine - Spark ignition
15 May 2026 14:55 → 14 Jun 2026 14:55 AEST
| Capex total (greenfield) |
$16.53M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,215,674
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$770.7k
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$103,306
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$6.20
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
$12.40
Shown in table Reported / source value How this was derived |
| Heat rate GJ/MWh |
9.00
Shown in table How this was derived |
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Plant-specific greenfield capital cost found in a contemporaneous press report describing Tahmoor as a $8 million methane generator project. I did not find a more direct owner/developer announcement or a separate refurbishment cost. The station is listed by the CER as Tahmoor Power Plant under waste coal mine gas accreditation, and EDL’s current Tahmoor materials identify the licence holder as EDL (TT) Pty Ltd. Capex is therefore treated as reported but with medium confidence because the source is a news report rather than an owner press release.