Sunraysia Solar Farm (SUNRSF1)

Solar · Sunraysia Solar Project Pty Ltd · Solar PV - Single axis tracking

Operational AEMO: In Service NSW1 Solar - Solar NEM data · 24 hours
229 MW
Registered nameplate capacity
24 hours revenue
$20.5k
Capacity factor
15.7%
Revenue / MWh
$23.71
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
229 MW

AEMO status In Service
Project status Operational (AI)

AEMO registration indicates Sunraysia Solar Farm was commissioned on 2021-12-01 and is in service; treated here as operational phase.

Region NSW1
Coordinates

MLF 0.8218
DUID SUNRSF1
Owner Sunraysia Solar Project Pty Ltd
Commissioned Dec 2021
Expected closure 2049
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM JA Solar
Module / inverter supplier PV modules / inverter supplier
Inverter OEM Sungrow
Inverter model SG250HX
Equipment confidence low
Stats window
01 Aug 2026 16:00 → 02 Aug 2026 16:00 AEST

Dispatch & revenue

01 Aug 2026 16:00 → 02 Aug 2026 16:00 AEST

Energy revenue (× MLF)
$20.5k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
863.9 MWh
Available
118.9 MWh
Curtailed
MWh
Curtailment
0.0%
of available
MLF used
0.8218
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of chargeINITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.7774
2025-07-01 0.8529
2026-07-01 0.8218

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
229 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield) default
$297.44M

Shown in table
$297.44M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,300,000

Shown in table
$1.30M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown