Solar · Sun Metals Corporation Pty Ltd · Solar PV - Fixed
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
12 Jun 2026 14:05 → 13 Jun 2026 14:05 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 1.0159 |
| 2025-07-01 | 1.0151 |
| Capex total (greenfield) |
$264.55M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,850,002
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$2.27M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$15,873
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026
Notes
Owner sources consistently describe the project as a ~$200 million solar farm, with Sun Metals citing $200 million to build its 143MWAC solar farm and an earlier Sun Metals article citing A$201 million for a 124MW solar farm. Commissioning appears to have been in May/August 2018, but the exact commissioned date was not required for capex. No plant-specific O&M was found, so large-scale solar PV O&M was not fully verified here; a conservative fixed O&M placeholder from AEMO/CSIRO-style benchmark material was not adopted into fixed_opex_annual_aud because the source excerpt available did not clearly isolate utility-scale fixed PV O&M for this plant size.