Stubbo Solar Farm (STUBSF1)

Solar · ACEN AUSTRALIA · Solar PV - Single axis tracking

Commissioning AEMO: In Commissioning NSW1 Solar - Solar NEM data · 24 hours
198 MW
Registered nameplate capacity
24 hours revenue
$50.0k
Capacity factor
18.5%
Revenue / MWh
$56.74
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
198 MW

AEMO status In Commissioning
Project status Commissioning (AI)

ACEN Australia project page and provided asset status indicate commissioning / in testing in late 2024 (acenrenewables.com.au; Renewables Now 2024).

Region NSW1
Coordinates

MLF 0.9427
DUID STUBSF1
Owner ACEN AUSTRALIA
Commissioned Dec 2024
Expected closure 2073
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM Ingeteam
Module / inverter supplier inverter technology
Inverter OEM Ingeteam
Inverter model inverter platform not specified
Equipment confidence medium
Stats window
21 Jul 2026 21:40 → 22 Jul 2026 21:40 AEST

Dispatch & revenue

21 Jul 2026 21:40 → 22 Jul 2026 21:40 AEST

Energy revenue (× MLF)
$50.0k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
880.5 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9427
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of chargeINITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-12-17 0.9422
2025-07-01 0.9429
2026-07-01 0.9427

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
198 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield) default
$257.40M

Shown in table
$257.40M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,300,000

Shown in table
$1.30M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown