Stubbo Solar Farm (STUBSF1)

Solar · ACEN AUSTRALIA · Solar PV - Single axis tracking

Commissioning AEMO: In Commissioning NSW1 Solar - Solar NEM data · 30 days
198 MW
Registered nameplate capacity
30 days revenue
$1.09M
Capacity factor
14.5%
Revenue / MWh
$52.93
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
198 MW

AEMO status In Commissioning
Project status Commissioning (AI)

AEMO registration status provided as "In Commissioning" and commissioned date listed as 2024-12-01 in the prompt; treated as commissioning phase rather than operational.

Region NSW1
Coordinates

MLF 0.9429
DUID STUBSF1
Owner ACEN AUSTRALIA
Commissioned Dec 2024
Expected closure 2073
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
14 May 2026 18:30 → 13 Jun 2026 18:30 AEST

Dispatch & revenue

14 May 2026 18:30 → 13 Jun 2026 18:30 AEST

Energy revenue (× MLF)
$1.09M
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
20,659.0 MWh
Available
20,519.5 MWh
Curtailed
15.2 MWh
Curtailment
0.1%
of available
MLF used
0.9429
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-12-17 0.9422
2025-07-01 0.9429

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
198 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield) default
$257.40M

Shown in table
$257.40M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,300,000

Shown in table
$1.30M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown