Wind · Snowtown Wind Farm Stage 2 Pty Ltd · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
12 Jun 2026 20:15 → 13 Jun 2026 20:15 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9613 |
| 2025-07-01 | 0.9695 |
| Capex total (greenfield) |
$649.41M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$5,154,034
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$10.25M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$81,361
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.74
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Greenfield Stage 2 project cost reported as A$439 million for the 270 MW Snowtown II project; the 126 MW Snowtown 2 South share is part of that project and is not separately costed in the source. No plant-specific O&M was found; server-side fallback used for O&M. No fuel or heat-rate values apply to wind.