Sebastopol Solar Farm (SEBSF1)

Solar · Sebastopol Asset Co Pty Ltd ATF Sebastopol Asset Trust · Solar PV - Single axis tracking

Operational AEMO: In Service NSW1 Solar - Solar NEM data · 30 days
90 MW
Registered nameplate capacity
30 days revenue
$445.4k
Capacity factor
12.8%
Revenue / MWh
$53.82
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
90 MW

AEMO status In Service
Project status Operational (AI)

pv magazine Australia (2022) reported Sebastopol Solar Farm had achieved commercial operation; FRV project page also says now operational.

Region NSW1
Coordinates -34.54600, 147.68800 (AI)

FRV/Sebastopol Solar Farm project page says the site is approximately 16 km south of Temora, NSW; NSW Planning Portal project materials support the same location.

MLF 0.9220
DUID SEBSF1
Owner Sebastopol Asset Co Pty Ltd ATF Sebastopol Asset Trust
Commissioned Jan 2023
Expected closure 2052
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM LONGi
Module / inverter supplier PV modules
Inverter OEM Sungrow
Inverter model inverter model not documented
Equipment confidence low
Stats window
14 May 2026 23:45 → 13 Jun 2026 23:45 AEST

Dispatch & revenue

14 May 2026 23:45 → 13 Jun 2026 23:45 AEST

Energy revenue (× MLF)
$445.4k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
8,276.5 MWh
Available
8,252.8 MWh
Curtailed
13.7 MWh
Curtailment
0.2%
of available
MLF used
0.9220
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.8752
2025-07-01 0.9220

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
90 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield) default
$117.00M

Shown in table
$117.00M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,300,000

Shown in table
$1.30M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown