Rocky Point Sugar Mill Cogeneration Plant (RPCG)

Other Generators · W.H.Heck and Sons Pty Ltd · Other - Other

Operational AEMO: In Service QLD1 Renewable Biomass or Waste - Bagasse NEM data · 30 days
30 MW
Registered nameplate capacity
30 days revenue
$-2.9k
Capacity factor
-0.2%
Revenue / MWh
Est. SRMC
$117.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
30 MW

AEMO status In Service
Project status Operational (AI)

World of Renewables (2009) reports the Rocky Point Cogeneration Plant was commissioned in August 2002 and operates 24/7 as a generating CHP plant; GEM lists it as operating.

Region QLD1
Coordinates -27.73780, 153.32610 (AI)

Global Energy Monitor GEM Wiki lists exact coordinates for Rocky Point Cogeneration power station: -27.7378, 153.3261.

MLF 1.0099
DUID RPCG
Owner W.H.Heck and Sons Pty Ltd
Commissioned
Expected closure 2073
Closure date
Technology Other - Other
Fuel Renewable Biomass or Waste - Bagasse
Plant supplier Alstom
Boiler / turbine equipment Bi-drum boiler; ST3 skid-mounted axial-flow steam turbine; four-pole 11kV, 50Hz, 33.3 MVA synchronous generator
Equipment confidence high
Stats window
14 May 2026 23:45 → 13 Jun 2026 23:45 AEST

Dispatch & revenue

14 May 2026 23:45 → 13 Jun 2026 23:45 AEST

Energy revenue (× MLF)
$-2.9k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
-43.4 MWh
Available
MWh
Curtailed
43.4 MWh
Curtailment
of available
MLF used
1.0099
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 1.0115
2025-07-01 1.0099

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Biomass
Capacity
30 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$117.00/MWh
Capex total (greenfield) default
$135.00M

Shown in table
$135.00M (2026 real AUD)

Capex refurbishment
Capex / MW default
$4,500,000

Shown in table
$4.50M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$70,000

Shown in table
$70.0k (2026 real AUD)

Variable OPEX / MWh default
$5.00

Shown in table
$5.00 (2026 real AUD)

Fuel cost / GJ default
$8.00

Shown in table
$8.00 (2026 real AUD)

Heat rate GJ/MWh default
14.00

Shown in table
$14.00 (2026 real AUD)

Confidence: unknown · Status: needs review · Capex basis: unknown