Quarantine (QPS2)

Gas Peakers · Origin Energy Power Limited · Turbine - OCGT

Operational AEMO: In Service SA1 Fossil - Natural Gas Pipeline NEM data · 24 hours
24 MW
Registered nameplate capacity
24 hours revenue
$5.9k
Capacity factor
9.9%
Revenue / MWh
$104.22
Est. SRMC
$128.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity
24 MW

AEMO status In Service
Project status Operational (AI)

Origin Energy generation page (originenergy.com.au, accessed 2026) describes Quarantine as its largest peaking power station with 2002 opening and 2009 expansion, indicating in-service operation.

Region SA1
Coordinates -34.77920, 138.52350 (AI)

Global Energy Observatory entry for Quarantine OCGT Power Plant Australia lists coordinates at Torrens Island: -34.7792, 138.5235.

MLF 0.9935
DUID QPS2
Owner Origin Energy Power Limited
Commissioned
Expected closure 2054
Closure date
Technology Turbine - OCGT
Fuel Fossil - Natural Gas Pipeline
Gas turbine OEM GE
Turbine / engine model Frame 9E
Equipment confidence high
Stats window
22 Jul 2026 02:05 → 23 Jul 2026 02:05 AEST

Dispatch & revenue

22 Jul 2026 02:05 → 23 Jul 2026 02:05 AEST

Energy revenue (× MLF)
$5.9k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
56.8 MWh
Available
50.5 MWh
Curtailed
50.5 MWh
Curtailment
100.0%
of available
MLF used
0.9935
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of chargeINITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9949
2025-07-01 0.9957
2026-07-01 0.9935

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
OCGT
Capacity
24 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$128.50/MWh
Capex total (greenfield) default
$28.80M

Shown in table
$28.80M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,200,000

Shown in table
$1.20M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$45,000

Shown in table
$45.0k (2026 real AUD)

Variable OPEX / MWh default
$2.50

Shown in table
$2.50 (2026 real AUD)

Fuel cost / GJ default
$12.00

Shown in table
$12.00 (2026 real AUD)

Heat rate GJ/MWh default
10.50

Shown in table
$10.50 (2026 real AUD)

Confidence: unknown · Status: needs review · Capex basis: unknown