Quarantine (QPS1)

Gas Peakers · Origin Energy Power Limited · Turbine - OCGT

Operational AEMO: In Service SA1 Fossil - Natural Gas Pipeline NEM data · 30 days
29 MW
Registered nameplate capacity
30 days revenue
$409.5k
Capacity factor
15.2%
Revenue / MWh
$129.04
Est. SRMC
$128.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity
29 MW

AEMO status In Service
Project status Operational (AI)

Origin Energy generation page (originenergy.com.au) describes Quarantine as the largest peaking power station in South Australia and notes it opened in 2002 with a 2009 expansion.

Region SA1
Coordinates -34.77920, 138.52350 (AI)

Global Energy Observatory lists Quarantine OCGT Power Plant at Torrens Island with coordinates -34.7792, 138.5235.

MLF 0.9957
DUID QPS1
Owner Origin Energy Power Limited
Commissioned
Expected closure 2053
Closure date
Technology Turbine - OCGT
Fuel Fossil - Natural Gas Pipeline
Gas turbine OEM GE Energy
Turbine / engine model Frame 9E
Equipment confidence high
Stats window
15 May 2026 02:20 → 14 Jun 2026 02:20 AEST

Dispatch & revenue

15 May 2026 02:20 → 14 Jun 2026 02:20 AEST

Energy revenue (× MLF)
$409.5k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
3,173.2 MWh
Available
19,263.2 MWh
Curtailed
16,090.0 MWh
Curtailment
83.5%
of available
MLF used
0.9957
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9949
2025-07-01 0.9957

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
OCGT
Capacity
29 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$128.50/MWh
Capex total (greenfield) default
$34.80M

Shown in table
$34.80M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,200,000

Shown in table
$1.20M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$45,000

Shown in table
$45.0k (2026 real AUD)

Variable OPEX / MWh default
$2.50

Shown in table
$2.50 (2026 real AUD)

Fuel cost / GJ default
$12.00

Shown in table
$12.00 (2026 real AUD)

Heat rate GJ/MWh default
10.50

Shown in table
$10.50 (2026 real AUD)

Confidence: unknown · Status: needs review · Capex basis: unknown