Proserpine Wind Farm - KCI

Wind · CI Proserpine Pty Ltd as trustee for the CI Proserpine Trust · Wind Turbine - Onshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 24 hours
—
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.50/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates —

DUID —
Owner CI Proserpine Pty Ltd as trustee for the CI Proserpine Trust
Commissioned —
Expected closure —
Closure date —
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM —
Turbine model —
Stats window
25 Sep 2026 00:00 → 25 Sep 2026 23:59 AEST

Dispatch & revenue

25 Sep 2026 00:00 → 25 Sep 2026 23:59 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
—
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.50/MWh
Capex total (greenfield)
—
Capex refurbishment
—
Capex / MW
$2,254,098

Shown in table
$2.25M (2026 real AUD)

Reported / source value
$2.20M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh default
$0.50

Shown in table
$0.50 (2026 real AUD)

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026

Notes
No plant-specific greenfield capex or operating cost data was found in the available official and indexed sources. The project website describes Proserpine Wind Farm as a proposed 900 MW wind farm in early-stage development, but no total project investment figure was located. AEMO/CSIRO GenCost and AEMO technical review materials were located for fallback benchmarking if needed, but no site-specific benchmark was applied here because the requested plant-specific capex search returned no verified figure. The project may also be withdrawn or not yet active, based on EPBC status and other sources, so capacity/commissioning details should be verified before any further modelling.