Osborne (OSB-AG)

Gas Baseload · Osborne Cogeneration Pty Ltd · Turbine - CCGT

Closed AEMO: In Service - Announced Withdrawal (Permanent) SA1 Fossil - Natural Gas Pipeline NEM data · 17h
180 MW
Registered nameplate capacity
17h revenue
$10.3k
Capacity factor
8.7%
Revenue / MWh
$38.64
Est. SRMC
$84.30/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity
180 MW

AEMO status In Service - Announced Withdrawal (Permanent)
Project status Closed (AI)

ATCO Australia power stations page (Osborne plant in service; operating cogeneration/combined-cycle modes)

Region SA1
Coordinates -34.79889, 138.49111 (AI)

En Academic / Wikipedia-derived Osborne Power Station coordinates near Osborne, South Australia

MLF 0.9995
DUID OSB-AG
Owner Osborne Cogeneration Pty Ltd
Commissioned
Expected closure 2027
Closure date 31 Dec 2027
Technology Turbine - CCGT
Fuel Fossil - Natural Gas Pipeline
Gas turbine OEM GE
CCGT configuration / turbine model 9FA+e combined-cycle configuration
Steam turbine OEM Alstom
Steam turbine model steam turbine model not documented
Equipment confidence medium
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 16:45 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 16:45 AEST

Energy revenue (× MLF)
$10.3k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
265.7 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9995
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9994
2025-07-01 0.9995

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
CCGT
Capacity
180 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$84.30/MWh
Capex total (greenfield) default
$324.00M

Shown in table
$324.00M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,800,000

Shown in table
$1.80M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$35,000

Shown in table
$35.0k (2026 real AUD)

Variable OPEX / MWh default
$1.80

Shown in table
$1.80 (2026 real AUD)

Fuel cost / GJ default
$11.00

Shown in table
$11.00 (2026 real AUD)

Heat rate GJ/MWh default
7.50

Shown in table
$7.50 (2026 real AUD)

Confidence: unknown · Status: needs review · Capex basis: unknown