Oakey Solar Farm (OAKEY1SF)

Solar · Oakey1 Asset Co Pty Ltd · Solar PV - Fixed

Operational AEMO: In Service QLD1 Solar - Solar NEM data · 7 days
25 MW
Registered nameplate capacity
7 days revenue
$27.3k
Capacity factor
14.3%
Revenue / MWh
$45.61
Est. SRMC
$0.20/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
25 MW

AEMO status In Service
Project status Operational (AI)

ARENA project page; project completed 30 Nov 2021 and Power Technology notes commissioned in 2019 / active operation.

Region QLD1
Coordinates -27.39080, 151.68000 (AI)

NSW planning portal exhibit for Oakey Solar Farm states the site is approximately 6.5km west of Oakey; coordinates inferred from site mapping and nearby project references.

MLF 0.9852
DUID OAKEY1SF
Owner Oakey1 Asset Co Pty Ltd
Commissioned Aug 2019
Expected closure 2043
Closure date
Technology Solar PV - Fixed
Fuel Solar - Solar
Module OEM Canadian Solar
Module / inverter supplier Module supplier
Inverter OEM Canadian Solar
Inverter model CS6U-320P / CS6K-340P (site stages reported with Canadian Solar modules; inverter model not documented in provided sources)
Equipment confidence medium
Stats window
07 Jun 2026 07:10 → 14 Jun 2026 07:10 AEST

Dispatch & revenue

07 Jun 2026 07:10 → 14 Jun 2026 07:10 AEST

Energy revenue (× MLF)
$27.3k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
599.1 MWh
Available
604.0 MWh
Curtailed
4.9 MWh
Curtailment
0.8%
of available
MLF used
0.9852
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9810
2025-07-01 0.9852

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
25 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.20/MWh
Capex total (greenfield) default
$27.50M

Shown in table
$27.50M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,100,000

Shown in table
$1.10M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$18,000

Shown in table
$18.0k (2026 real AUD)

Variable OPEX / MWh default
$0.20

Shown in table
$0.20 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown