Oakey Power Station (OAKEY2)

Gas Peakers · Oakey Power Holdings Pty Ltd · Turbine - OCGT

Operational AEMO: In Service QLD1 Fossil - Natural Gas Pipeline NEM data · 30 days
173 MW
Registered nameplate capacity
30 days revenue
$2.4k
Capacity factor
0.0%
Revenue / MWh
$129.53
Est. SRMC
$128.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
173 MW

AEMO status In Service
Project status Operational (AI)

Power Technology profile (GlobalData) says Oakey Power Station was commissioned in December 1999 and is currently active.

Region QLD1
Coordinates -27.41861, 151.68000 (AI)

Grokipedia lists Oakey Power Station at 27°25′07″S 151°40′48″E.

MLF 0.9666
DUID OAKEY2
Owner Oakey Power Holdings Pty Ltd
Commissioned
Expected closure 2050
Closure date
Technology Turbine - OCGT
Fuel Fossil - Natural Gas Pipeline
Gas turbine OEM Siemens Energy
Turbine / engine model SGT-2000E
Equipment confidence high
Stats window
18 May 2026 19:30 → 17 Jun 2026 19:30 AEST

Dispatch & revenue

18 May 2026 19:30 → 17 Jun 2026 19:30 AEST

Energy revenue (× MLF)
$2.4k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
18.7 MWh
Available
34,303.7 MWh
Curtailed
34,285.0 MWh
Curtailment
99.9%
of available
MLF used
0.9666
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9572
2025-07-01 0.9666

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
OCGT
Capacity
173 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$128.50/MWh
Capex total (greenfield) default
$207.60M

Shown in table
$207.60M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,200,000

Shown in table
$1.20M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$45,000

Shown in table
$45.0k (2026 real AUD)

Variable OPEX / MWh default
$2.50

Shown in table
$2.50 (2026 real AUD)

Fuel cost / GJ default
$12.00

Shown in table
$12.00 (2026 real AUD)

Heat rate GJ/MWh default
10.50

Shown in table
$10.50 (2026 real AUD)

Confidence: unknown · Status: needs review · Capex basis: unknown