Numurkah Solar Farm (NUMURSF1)

Solar · Numurkah Solar Farm Pty Ltd · Solar PV - Single axis tracking

Operational AEMO: In Service VIC1 Solar - Solar NEM data · 24 hours
101 MW
Registered nameplate capacity
24 hours revenue
$549
Capacity factor
0.7%
Revenue / MWh
$30.67
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
101 MW

AEMO status In Service
Project status Operational (AI)

GlobalData power plant profile (2024) says the project entered commercial operation in July 2019; AEMO Commissioned 2019-08-01 aligns with operational status.

Region VIC1
Coordinates -36.24400, 145.45200 (AI)

Numurkah Solar Farm website says the site is in Drumanure, about 3 km east of Wunghnu and 6 km south east of Numurkah, Victoria; exact plant coordinates not stated in provided sources.

MLF 0.9441
DUID NUMURSF1
Owner Numurkah Solar Farm Pty Ltd
Commissioned Aug 2019
Expected closure 2044
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM LONGi
Module / inverter supplier LONGi Solar Technology / module supplier
Inverter OEM
Inverter model String inverters not documented in provided sources
Equipment confidence high
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST

Energy revenue (× MLF)
$549
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
17.9 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9441
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9477
2025-07-01 0.9463
2026-02-24 0.9441

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
101 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield) default
$131.40M

Shown in table
$131.40M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,300,000

Shown in table
$1.30M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown