New England Solar Farm BESS (NESBESS2)

BESS · ACEN RENEWABLES · Storage - Battery

Development AEMO: Anticipated NSW1 Other - Other NEM data · 30 days
200/400 MW
Researched capacity / storage
30 days revenue
$261.1k
Capacity factor
-0.7%
Revenue / MWh
Est. SRMC
$1.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity (AI)
200 MW / 400 MWh

ACEN New England Solar & Energy Storage project page states the project will ultimately include a 200 MW/2 hr battery; 200 MW x 2 h = 400 MWh (acenrenewables.com).

AEMO status Anticipated
Project status Development (AI)

ACEN project page describes the site as an upcoming 200 MW/2 hr battery development (acenrenewables.com, accessed via search result snippet).

Region NSW1
Coordinates -30.35000, 151.63000 (AI)

NSW major projects portal excerpt says the project is approximately 6 km east of Uralla, NSW (majorprojects.planningportal.nsw.gov.au).

MLF 0.9197
DUID NESBESS2
Owner ACEN RENEWABLES
Commissioned Dec 2026
Expected closure 2076
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM Battery OEM not documented in provided results
Battery platform / chemistry Grid-scale BESS, 2-hour duration
Inverter OEM
Inverter / PCS model
Equipment confidence medium
Stats window
21 Aug 2026 03:30 → 20 Sep 2026 03:30 AEST

Dispatch & revenue

21 Aug 2026 03:30 → 20 Sep 2026 03:30 AEST

Energy revenue (× MLF)
$261.1k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
-951.3 MWh
Available
10,247.1 MWh
Curtailed
11,354.9 MWh
Curtailment
110.8%
of available
MLF used
0.9197
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

🔋 State of charge

Stored energy at the start of each 5‑minute interval (AEMO INITIAL_ENERGY_STORAGE). Available up to the latest next‑day dispatch file.

0.0 MWh 0%
at 19 Sep 03:30 · of 400 MWh registered

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of chargeINITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2026-02-18 0.8903
2026-07-01 0.9197

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
200 MW / 400 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield) default
$140.00M

Shown in table
$140.00M (2026 real AUD)

Capex refurbishment
Capex / MWh storage default
$350,000

Shown in table
$350.0k (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$25,000

Shown in table
$25.0k (2026 real AUD)

Variable OPEX / MWh default
$1.50

Shown in table
$1.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown