Murray Bridge - Onkaparinga Pipeline Pump 2 (MBPS2PV1)

Solar · South Australian Water Corporation · Solar PV - Single axis tracking

Operational AEMO: In Service SA1 Solar - Solar NEM data · 24 hours
14 MW
Registered nameplate capacity
24 hours revenue
$68
Capacity factor
0.5%
Revenue / MWh
$41.93
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity
14 MW

AEMO status In Service
Project status Operational (AI)

GlobalData 2024: project commissioned in 2022 and currently active; SA Water news 2022 indicates panels were installed and connected.

Region SA1
Coordinates -35.11700, 139.26700 (AI)

LatLong.net coordinates for Murray Bridge, SA used as approximate site location; specific plant coordinates not found in provided results.

MLF 1.0127
DUID MBPS2PV1
Owner South Australian Water Corporation
Commissioned Aug 2022
Expected closure 2041
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM JA Solar
Module / inverter supplier PV modules
Inverter OEM SMA Solar Technology
Inverter model inverters
Equipment confidence high
Stats window
12 Jun 2026 16:45 → 13 Jun 2026 16:45 AEST

Dispatch & revenue

12 Jun 2026 16:45 → 13 Jun 2026 16:45 AEST

Energy revenue (× MLF)
$68
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
1.6 MWh
Available
0.1 MWh
Curtailed
0.1 MWh
Curtailment
55.3%
of available
MLF used
1.0127
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9993
2025-07-01 1.0127

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
14 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield) default
$17.88M

Shown in table
$17.88M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,300,000

Shown in table
$1.30M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown