Solar · Munna Creek Solar Farm Investments Pty Ltd as trustee for the Munna Creek Solar Farm Trust · Solar PV - Single axis tracking
12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST
| Capex total (greenfield) default |
$200.20M
Shown in table |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW default |
$1,300,000
Shown in table |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$20,000
Shown in table |
| Variable OPEX / MWh default |
$0.25
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: unknown · Status: needs review · Capex basis: unknown