Mt Stuart (MSTUART1)

Other Generators · Origin Energy Mt Stuart · Turbine - OCGT

Operational AEMO: In Service QLD1 Fossil - Diesel NEM data · 24 hours
146 MW
Registered nameplate capacity
24 hours revenue
$25
Capacity factor
0.0%
Revenue / MWh
$31.14
Est. SRMC
$2.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
146 MW

AEMO status In Service
Project status Operational (AI)

Wikipedia/Origin Energy: Mount Stuart Power Station commissioned Dec 1998 and operates as a peaking plant; Origin says the site uses an open-cycle gas turbine system.

Region QLD1
Coordinates -19.33800, 146.85100 (AI)

Wikipedia coordinates for Mount Stuart Power Station: 19°20′17″S 146°51′04″E.

MLF 0.9121
DUID MSTUART1
Owner Origin Energy Mt Stuart
Commissioned
Expected closure 2033
Closure date
Technology Turbine - OCGT
Fuel Fossil - Diesel
Equipment OEM GE Power
Equipment type / model 3x gas turbines (OCGT peaking plant), model not publicly specified
Secondary OEM Mitsubishi Power
Secondary equipment electric generator(s) / turbine package support, model not publicly specified
Equipment confidence medium
Stats window
12 Jun 2026 18:15 → 13 Jun 2026 18:15 AEST

Dispatch & revenue

12 Jun 2026 18:15 → 13 Jun 2026 18:15 AEST

Energy revenue (× MLF)
$25
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
0.8 MWh
Available
1,380.0 MWh
Curtailed
1,380.0 MWh
Curtailment
100.0%
of available
MLF used
0.9121
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9471
2025-07-01 0.9121

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Other
Capacity
146 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$2.00/MWh
Capex total (greenfield) default
$292.00M

Shown in table
$292.00M (2026 real AUD)

Capex refurbishment
Capex / MW default
$2,000,000

Shown in table
$2.00M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$40,000

Shown in table
$40.0k (2026 real AUD)

Variable OPEX / MWh default
$2.00

Shown in table
$2.00 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown