Mt Piper (MP2)

Coal · EnergyAustralia NSW Pty Ltd · Turbine - Steam Sub Critical

Operational AEMO: In Service NSW1 Fossil - Black Coal NEM data · 8h
660 MW
Registered nameplate capacity
8h revenue
$114.7k
Capacity factor
30.8%
Revenue / MWh
$70.62
Est. SRMC
$52.60/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
660 MW

AEMO status In Service
Project status Operational (AI)

EnergyAustralia Mt Piper power station page (energyaustralia.com.au) describes Mt Piper as an existing generating station in service; Power Technology profiles the plant as commissioned in 1992 and active.

Region NSW1
Coordinates -33.44200, 149.88700 (AI)

EnergyAustralia says Mt Piper is 25 km from Lithgow; White Pages lists 350 Poulder Road, Portland NSW 2847; map/site references place the station near Portland, NSW.

MLF 0.9727
DUID MP2
Owner EnergyAustralia NSW Pty Ltd
Commissioned Jan 2027
Expected closure 2040
Closure date
Technology Turbine - Steam Sub Critical
Fuel Fossil - Black Coal
Steam turbine OEM Toshiba Energy Systems and Solutions
Turbine / boiler supplier steam turbine
Equipment confidence high
Stats window
14 Jun 2026 00:00 → 14 Jun 2026 08:25 AEST

Dispatch & revenue

14 Jun 2026 00:00 → 14 Jun 2026 08:25 AEST

Energy revenue (× MLF)
$114.7k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
1,624.4 MWh
Available
2,858.3 MWh
Curtailed
1,612.5 MWh
Curtailment
56.4%
of available
MLF used
0.9727
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9706
2025-07-01 0.9727

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Black coal
Capacity
660 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$52.60/MWh
Capex total (greenfield) default
$2,310.00M

Shown in table
$2,310.00M (2026 real AUD)

Capex refurbishment
Capex / MW default
$3,500,000

Shown in table
$3.50M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh default
$4.00

Shown in table
$4.00 (2026 real AUD)

Fuel cost / GJ default
$4.50

Shown in table
$4.50 (2026 real AUD)

Heat rate GJ/MWh default
10.80

Shown in table
$10.80 (2026 real AUD)

Confidence: unknown · Status: needs review · Capex basis: unknown