Mortlake (MORTLK11)

Gas Peakers · Origin Energy Power Limited · Turbine - OCGT

Operational AEMO: In Service VIC1 Fossil - Natural Gas Pipeline NEM data · 19h
292 MW
Registered nameplate capacity
19h revenue
$21.0k
Capacity factor
6.0%
Revenue / MWh
$63.53
Est. SRMC
$128.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
292 MW

AEMO status In Service
Project status Operational (AI)

Mortlake Power Station is described as a 566 MW open-cycle gas-fired power station and AEMO shows it as In Service (Origin/Wikipedia/Grokipedia, 2024-2026).

Region VIC1
Coordinates -38.06310, 142.66780 (AI)

Global Energy Observatory lists Mortlake OCGT Power Plant coordinates at -38.0631, 142.6678; consistent with Wikipedia/Wikidata location references.

MLF 0.9969
DUID MORTLK11
Owner Origin Energy Power Limited
Commissioned
Expected closure 2047
Closure date
Technology Turbine - OCGT
Fuel Fossil - Natural Gas Pipeline
Gas turbine OEM General Electric
Turbine / engine model LM6000
Equipment confidence medium
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 19:15 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 19:15 AEST

Energy revenue (× MLF)
$21.0k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
331.1 MWh
Available
510.4 MWh
Curtailed
510.7 MWh
Curtailment
100.1%
of available
MLF used
0.9969
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9914
2025-07-01 0.9969

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
OCGT
Capacity
292 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$128.50/MWh
Capex total (greenfield) default
$350.40M

Shown in table
$350.40M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,200,000

Shown in table
$1.20M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$45,000

Shown in table
$45.0k (2026 real AUD)

Variable OPEX / MWh default
$2.50

Shown in table
$2.50 (2026 real AUD)

Fuel cost / GJ default
$12.00

Shown in table
$12.00 (2026 real AUD)

Heat rate GJ/MWh default
10.50

Shown in table
$10.50 (2026 real AUD)

Confidence: unknown · Status: needs review · Capex basis: unknown