Metz Solar Farm (METZSF1)

Solar · Metz ProjectCo Pty Ltd as trustee for Metz ProjectCo Trust · Solar PV - Single axis tracking

Operational AEMO: In Service NSW1 Solar - Solar NEM data · 18h
135 MW
Registered nameplate capacity
18h revenue
$3.7k
Capacity factor
5.0%
Revenue / MWh
$30.78
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
135 MW

AEMO status In Service
Project status Operational (AI)

The Metz Solar Farm site states the project is generating electricity and describes it in operational terms; Ren eweconomy reported it reached full generating capacity in 2022.

Region NSW1
Coordinates -30.46000, 151.64000 (AI)

Metz Solar Farm project page says the site is approximately 15 km from Armidale, NSW; exact plant coordinates were not documented in the provided sources so this is an approximate Armidale-area location.

MLF 0.8557
DUID METZSF1
Owner Metz ProjectCo Pty Ltd as trustee for Metz ProjectCo Trust
Commissioned Apr 2023
Expected closure 2052
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM Risen Energy
Module / inverter supplier PV modules and inverters
Inverter OEM SMA Solar Technology
Inverter model inverter platform/model not documented
Equipment confidence medium
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 17:30 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 17:30 AEST

Energy revenue (× MLF)
$3.7k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
121.6 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.8557
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.8668
2025-07-01 0.8557

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
135 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield) default
$175.50M

Shown in table
$175.50M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,300,000

Shown in table
$1.30M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown