Solar · South Australian Water Corporation · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
06 Jun 2026 22:25 → 13 Jun 2026 22:25 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9802 |
| 2025-07-01 | 1.0252 |
| Capex total (greenfield) |
$5.21M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$315,657
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
How this was derived Reference |
| Fixed OPEX / MW-yr default |
$20,000
Shown in table |
| Variable OPEX / MWh default |
$0.25
Shown in table How this was derived Reference |
| Fuel cost / GJ |
$0.00
Shown in table Reported / source value |
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026
Notes
Plant-specific greenfield capex was not found; capex uses the only site-specific reported figure located in the planning report, which states the cost of the proposed Mannum PPS.3 solar PV development is more than $4 million. This likely refers to the broader Crown Development application rather than an exact final project cost, so capex is a lower-bound proxy and should be reviewed. SA Water’s Zero Cost Energy Future program states the utility is investing more than $300 million across 154 MW of solar PV at 30+ sites, but that is program-level, not site-specific. The site is registered as 12.4 MW AC in ESCOSA licence material with 42,672 x 380W panels and single-axis tracking.