Solar · South Australian Water Corporation · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
15 May 2026 02:50 → 14 Jun 2026 02:50 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9926 |
| 2025-07-01 | 1.0257 |
| Capex total (greenfield) |
$22.63M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,371,308
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$20,000
Shown in table |
| Variable OPEX / MWh |
$0.26
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
I found evidence that MAPL2 is part of SA Water's Zero Cost Energy Future program and that the site was approved/under construction, but I did not find an authoritative plant-specific construction cost for this exact DUID/site. Because no verified project-level capex figure was located, I left capex fields null rather than substituting a benchmark. The planning documents indicate the project is part of a broader program and the exact spend for this DUID was not stated in the sources reviewed.