Mackintosh (MACKNTSH)

Hydro · Hydro-Electric Corporation · Hydro - Dam

Operational AEMO: In Service TAS1 Hydro - Water NEM data · 0h
80 MW
Registered nameplate capacity
Est. SRMC
$1.00/MWh
Key information
Capacity
80 MW

AEMO status In Service
Project status Operational (AI)

Hydro Tasmania fact sheet (commissioned in 1982; single 81 MW unit) and GEO plant listing indicate the station is in service / operating.

Region TAS1
Coordinates -41.69940, 145.64720 (AI)

Global Energy Observatory entry for Mackintosh Hydroelectric Power Station (lat -41.6994, lon 145.6472).

DUID MACKNTSH
Owner Hydro-Electric Corporation
Commissioned
Expected closure 2100
Closure date
Technology Hydro - Dam
Fuel Hydro - Water
Turbine OEM ANDRITZ
Turbine type / model Francis turbine
Equipment confidence medium
Stats window
15 Jun 2026 00:00 → 15 Jun 2026 00:15 AEST

Dispatch & revenue

15 Jun 2026 00:00 → 15 Jun 2026 00:15 AEST

No dispatch data for DUID MACKNTSH in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Hydro
Capacity
80 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.00/MWh
Capex total (greenfield) default
$319.60M

Shown in table
$319.60M (2026 real AUD)

Capex refurbishment
Capex / MW default
$4,000,000

Shown in table
$4.00M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$40,000

Shown in table
$40.0k (2026 real AUD)

Variable OPEX / MWh default
$1.00

Shown in table
$1.00 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown