Wind · Liverpool Range Wind Farm Pty Ltd · Wind Turbine - Onshore
22 Jul 2026 00:00 → 22 Jul 2026 23:59 AEST
| Capex total (greenfield) |
$2,049.18M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,543,057
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh |
$0.51
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Project capacity used for capex normalization is 1332 MW (full build), as reported by Tilt Renewables in 2025; this yields an implied capex of about A$1.51 million/MW. No plant-specific fixed O&M figure was found, so fallback O&M was not applied to avoid overstatement without a verified source.