Lincoln Gap Wind Farm - Stage 2 (LGAPWF2)

Wind · Lincoln Gap Wind Farm Pty Ltd · Wind Turbine - Onshore

Operational AEMO: In Service SA1 Wind - Wind NEM data · 24 hours
86 MW
Registered nameplate capacity
24 hours revenue
$18.4k
Capacity factor
30.5%
Revenue / MWh
$29.10
Est. SRMC
$0.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity
86 MW

AEMO status In Service
Project status Operational (AI)

RATCH Australia project page (2022) lists Lincoln Gap Wind Farm Stage 2 as completed in March 2022 and operational.

Region SA1
Coordinates -32.84400, 137.80900 (AI)

Project pages and industry reports place Lincoln Gap Wind Farm about 15 km west of Port Augusta, South Australia.

MLF 0.9689
DUID LGAPWF2
Owner Lincoln Gap Wind Farm Pty Ltd
Commissioned Feb 2022
Expected closure 2045
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM Vestas
Turbine model V136-3.45 MW (delivered in 3.6 MW power-optimised mode)
Equipment confidence high
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST

Energy revenue (× MLF)
$18.4k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
632.9 MWh
Available
1,033.3 MWh
Curtailed
400.4 MWh
Curtailment
38.7%
of available
MLF used
0.9689
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9576
2025-07-01 0.9689

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
86 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.50/MWh
Capex total (greenfield) default
$190.08M

Shown in table
$190.08M (2026 real AUD)

Capex refurbishment
Capex / MW default
$2,200,000

Shown in table
$2.20M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh default
$0.50

Shown in table
$0.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown