Limondale Solar Farm 2 (LIMOSF21)

Solar · Limondale Sun Farm Pty Ltd · Solar PV - Single axis tracking

Operational AEMO: In Service NSW1 Solar - Solar NEM data · 7 days
29 MW
Registered nameplate capacity
7 days revenue
$38.3k
Capacity factor
13.6%
Revenue / MWh
$57.87
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
29 MW

AEMO status In Service
Project status Operational (AI)

RWE Australia project page and AEMO/industry reporting indicate the solar farm is in service; the plant was commissioned in 2023 and is operating commercially.

Region NSW1
Coordinates -34.82900, 143.47400 (AI)

Qube project page says the site is located 14 kilometres south of Balranald, NSW; NSW planning documents identify the Limondale site in Balranald Shire.

MLF 0.8528
DUID LIMOSF21
Owner Limondale Sun Farm Pty Ltd
Commissioned Apr 2023
Expected closure 2050
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM SunPower
Module / inverter supplier SunPower P-Series modules
Inverter OEM SMA
Inverter model Sunny Central 2750-EV / MVPS 5500
Equipment confidence high
Stats window
06 Jun 2026 23:25 → 13 Jun 2026 23:25 AEST

Dispatch & revenue

06 Jun 2026 23:25 → 13 Jun 2026 23:25 AEST

Energy revenue (× MLF)
$38.3k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
662.7 MWh
Available
694.8 MWh
Curtailed
39.4 MWh
Curtailment
5.7%
of available
MLF used
0.8528
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.7793
2025-07-01 0.8528

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
29 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield) default
$37.67M

Shown in table
$37.67M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,300,000

Shown in table
$1.30M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown