BESS · Tilt Renewables Australia Pty Ltd · Storage - Battery
Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2025-04-08 | 0.9889 |
| 2025-07-01 | 0.9902 |
| Capex total (greenfield) |
$24.59M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$122,951
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$2.56M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$25,615
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.54
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 09 Jun 2026
Notes
Net Zero Economy Authority states the 100 MW BESS facility brings $24 million of investment to the Latrobe. This appears to be the project investment figure used here. Capacity 100 MW / 200 MWh from Tilt Renewables. Fixed OPEX and variable OPEX use lite-tier battery defaults due to lack of project-specific operating cost data.