Dispatch target (cleared) vs availability — 5‑minute intervals. TAS1 regional price (RRP) on right axis.
15 May 2026 03:55 → 14 Jun 2026 03:55 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9293 |
| 2025-07-01 | 0.9314 |
| Capex total (greenfield) |
$151.40M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
$37.38M
Shown in table Reported / source value The saved AI note for this row describes refurbishment or upgrade capex, not greenfield construction. See Capex refurbishment or run Refresh from AI for an updated source. Reference |
| Capex / MW derived |
$4,672,897
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$1.51M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$46,729
Shown in table Reported / source value |
| Variable OPEX / MWh |
$1.17
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 09 Jun 2026
Notes
Lake Echo is a long-lived hydro station commissioned in 1956. A $32M refurbishment completed in 2022 modernised the station and added remote operation capability. No plant-specific greenfield construction cost was found in the searched official sources, so greenfield capex remains unverified.