Lake Bonney Battery Energy Storage (LBB1)

BESS · Lake Bonney BESS Pty Limited · Storage - Battery

Operational AEMO: In Service SA1 Other - Other NEM data · 24 hours
25/52 MW
Registered nameplate capacity / storage
24 hours revenue
$507
Capacity factor
0.0%
Revenue / MWh
$1,690.32
Est. SRMC
$1.98/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity
25 MW / 52 MWh

AEMO status In Service
Project status Operational (AI)

pv magazine Australia, 2019: battery energized and expected to be fully commissioned by year-end; ARENA project summary places it through development, construction and commissioning phases.

Region SA1
Coordinates

Location described as adjacent to Lake Bonney Wind Farm near Millicent, South Australia (ARENA/Infigen); precise site coordinates not found in provided sources.

MLF 0.9905
DUID LBB1
Owner Lake Bonney BESS Pty Limited
Commissioned Nov 2019
Expected closure 2034
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM Tesla
Battery platform / chemistry Powerpack
Inverter OEM Tesla
Inverter / PCS model Tesla inverter/PCS (documented as 48 inverters)
Equipment confidence high
Stats window
13 Jun 2026 01:35 → 14 Jun 2026 01:35 AEST

Dispatch & revenue

13 Jun 2026 01:35 → 14 Jun 2026 01:35 AEST

Energy revenue (× MLF)
$507
FCAS revenue (× MLF)
$3
FCAS volume
147.9 MWh
Dispatched
0.3 MWh
Available
70.0 MWh
Curtailed
76.6 MWh
Curtailment
109.5%
of available
MLF used
0.9905
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-09-26 1.0370
2025-07-01 0.9905

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
25 MW / 52 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.98/MWh
Capex total (greenfield)
$50.26M

Shown in table
$50.26M (2026 real AUD)

Reported / source value
$38.00M (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Owner page confirms the project was co-funded and gives the same total project cost.

Reference
Lake Bonney Battery Energy Storage System (high confidence)
Source recorded 09 Jun 2026

Capex refurbishment
Capex / MWh storage derived
$966,626

Shown in table
$966.6k (2026 real AUD)

Reported / source value
$730.8k (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Capacity used to derive implied capex per MWh from reported total project cost.

Reference
Infigen to build new Tesla battery at Lake Bonney wind farm (high confidence)
Source recorded 09 Jun 2026

Fixed OPEX (annual)
$826.7k

Shown in table
$826.7k (2026 real AUD)

Reported / source value
$625.0k (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$33,069

Shown in table
$33.1k (2026 real AUD)

Reported / source value
$25.0k (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific fixed O&M source found in the provided search results, so the server-side default was used.

Variable OPEX / MWh
$1.98

Shown in table
$1.98 (2026 real AUD)

Reported / source value
$1.50 (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific variable O&M source found in the provided search results, so the server-side default was used.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 09 Jun 2026

Notes
Original greenfield battery project cost reported as ~A$38 million for the 25 MW / 52 MWh Lake Bonney Battery Energy Storage System. Funding included A$5 million from the SA Government and A$5 million from ARENA. No plant-specific refurbishment capex identified.

Sources