Wind · Lake Bonney Wind Power Pty Ltd · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
07 Jun 2026 05:05 → 14 Jun 2026 05:05 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9709 |
| 2025-07-01 | 0.9297 |
| Capex total (greenfield) |
$684.93M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$4,307,745
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh |
$0.86
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 09 Jun 2026
Notes
Project-specific greenfield capex found in contemporaneous reporting for Lake Bonney Stage 2: $400 million for 53 turbines / 159 MW. This is used for LKBONNY2. O&M is not separately reported in the sources reviewed; internal default fixed O&M was not used because the request prioritised source-backed information and no plant-specific O&M figure was found. Lake Bonney 2 is part of the broader Lake Bonney wind farm complex, but the $400 million figure aligns with the 159 MW Stage 2 project.