Gas Peakers · Origin Energy Power Limited · Turbine - OCGT
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
14 May 2026 22:00 → 13 Jun 2026 22:00 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9712 |
| 2025-07-01 | 0.9522 |
| Capex total (greenfield) |
$50.63M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,265,823
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$45,000
Shown in table |
| Variable OPEX / MWh default |
$2.50
Shown in table |
| Fuel cost / GJ default |
$12.00
Shown in table |
| Heat rate GJ/MWh |
11.88
Shown in table How this was derived Reference |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 09 Jun 2026
Notes
Plant-specific greenfield capex could not be verified from owner/developer or government sources in the searched material. The available evidence confirms the station is an existing 80 MW OCGT (2 x 40 MW) at Monbulla/Penola and that AEMO uses a static heat rate of 11.88 GJ/MWh. O&M, fuel cost, asset life, and capex should be revisited if a primary source becomes available.