Coal · Kogan Creek Power Station Pty Ltd · Turbine - Steam Super Critical
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 19:15 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9692 |
| 2025-07-01 | 0.9737 |
| Capex total (greenfield) |
$1,986.75M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
$40.89M
Shown in table Reported / source value How this was derived Reference |
| Capex / MW derived |
$2,670,370
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh default |
$4.00
Shown in table |
| Fuel cost / GJ default |
$4.50
Shown in table |
| Heat rate GJ/MWh default |
10.80
Shown in table |
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 09 Jun 2026
Notes
Greenfield capex is based on CS Energy / project-opening sources describing the $1.2 billion plant opening in 2007. A separate brownfield overhaul cost of $35 million in 2022 is recorded as refurbishment only. No plant-specific O&M, fuel price, or heat-rate source was located in the searched official materials; those fields remain blank rather than inferred.