Solar · Kingaroy PropertyCo Pty Ltd as trustee for Kingaroy Property Trust · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-09-03 | 0.9775 |
| 2025-07-01 | 0.9795 |
| Capex total (greenfield) |
$56.77M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,419,214
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$20,000
Shown in table |
| Variable OPEX / MWh default |
$0.25
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 09 Jun 2026
Notes
No plant-specific greenfield capex figure was found in official owner/developer, government, or finance sources. The project is confirmed as a 40 MW solar farm in Queensland and in service by 2024-11-01, but publicly available sources located here did not disclose total construction cost. A metered nameplate of 47.56 MW with 40 MW export cap appears in government documentation; later METLEN references describe Kingaroy as 53 MW in portfolio refinancing materials, which likely reflects a portfolio or DC-rating figure and should not be used as the DUID’s registered AC capacity for capex normalization.