Kidston Solar Project Phase Two 270MW

Solar · Genex Power Limited · Solar PV - Fixed

Development AEMO: Publicly Announced Solar - Solar NEM data · 30 days
—
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.00/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates —

DUID —
Owner Genex Power Limited
Commissioned —
Expected closure 2045
Closure date —
Technology Solar PV - Fixed
Fuel Solar - Solar
Module OEM —
Module / inverter supplier —
Inverter OEM —
Inverter model —
Stats window
26 Aug 2026 12:40 → 25 Sep 2026 12:40 AEST

Dispatch & revenue

26 Aug 2026 12:40 → 25 Sep 2026 12:40 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
—
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
—
Capex refurbishment
—
Capex / MW
$1,160,338

Shown in table
$1.16M (2026 real AUD)

Reported / source value
$1.10M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr default
$18,000

Shown in table
$18.0k (2026 real AUD)

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Heat rate GJ/MWh
—

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 09 Jun 2026

Notes
No reliable plant-specific greenfield capex announcement for Kidston Solar Project Phase Two 270MW was found in the available search results. The only clearly quantified Genex Kidston cost found related to the separate 250MW pumped hydro project (total development cost $775M), which must not be used for this solar project. AEMO/CSIRO solar PV references were identified for technology characteristics only; capex was not inferred from benchmarks because the prompt prioritises project-specific cost announcements and no such value was located.

Sources