Wind · Windlab / Eurus · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
13 Jun 2026 00:20 → 14 Jun 2026 00:20 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9703 |
| 2025-07-01 | 0.9813 |
| Capex total (greenfield) |
$216.22M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$5,005,005
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$3.21M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$74,324
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.68
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 09 Jun 2026
Notes
Project-specific reported greenfield total project cost of $160 million was announced at financial close for Kennedy Energy Park Phase I, which included 43.2 MW of wind plus 15 MW solar and a battery; capex_per_mw is calculated on the wind DUID share only. No separate wind-only construction cost was found. Fixed O&M used server fallback/default for onshore wind due to lack of plant-specific O&M data. The wind component was initially announced at different earlier scope/capacity levels, but the reported $160 million financial-close figure is the best available project-level source for the final phase I hybrid project.