Kennedy Energy Park - Phase 1 - Storage (KEPBG1)

BESS · Windlab/Eurus · Storage - Battery

Commissioning AEMO: In Service QLD1 Other - Other NEM data · 30 days
2/4 MW
Registered nameplate capacity / storage
30 days revenue
$0
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$2.03/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
2 MW / 4 MWh

AEMO status In Service
Project status Commissioning (AI)

Kennedy Energy Park site reports the 2 MW/4 MWh battery uses four 500 kW Tesla Powerpacks; project remained in proof-of-concept / commissioning phase in ARENA and CEFC materials.

Region QLD1
Coordinates -20.87500, 144.42090 (AI)

GEM.wiki and Kennedy Energy Park sources place Phase 1 near Hughenden at about -20.875, 144.4209.

MLF 0.9813
DUID KEPBG1
Owner Windlab/Eurus
Commissioned
Expected closure 2046
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM Tesla
Battery platform / chemistry Powerpack
Inverter OEM Tesla
Inverter / PCS model Powerpack 500 kW
Equipment confidence high
Stats window
15 May 2026 04:45 → 14 Jun 2026 04:45 AEST

Dispatch & revenue

15 May 2026 04:45 → 14 Jun 2026 04:45 AEST

Energy revenue (× MLF)
$0
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9813
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9703
2025-07-01 0.9813

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
2 MW / 4 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$2.03/MWh
Capex total (greenfield)
$216.22M

Shown in table
$216.22M (2026 real AUD)

Reported / source value
$160.00M (2017 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Official ARENA media release references the Kennedy Park wind, solar and battery project at A$160 million.

Reference
Media Release (high confidence)
Source recorded 09 Jun 2026

Capex refurbishment
Capex / MWh storage derived
$54,054,054

Shown in table
$54.05M (2026 real AUD)

Reported / source value
$40.00M (2017 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$67.6k

Shown in table
$67.6k (2026 real AUD)

Reported / source value
$50.0k (2017 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$33,784

Shown in table
$33.8k (2026 real AUD)

Reported / source value
$25.0k (2017 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Variable OPEX / MWh
$2.03

Shown in table
$2.03 (2026 real AUD)

Reported / source value
$1.50 (2017 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 09 Jun 2026

Notes
Plant-specific project cost was reported for the full Kennedy Energy Park Phase I hybrid project at A$160 million, which includes the 2 MW / 4 MWh battery component within a larger wind-solar-battery precinct. No separate battery-only greenfield capex was found, so the full project cost is used as the best available reported figure; this likely overstates the battery DUID share. The project was developed by Windlab and Eurus and includes 43.2 MW wind, 15 MW solar, and 2 MW/4 MWh battery storage.

Sources